女人张开腿让男桶喷水高潮_国内精品免费一区二区2001_日韩综合在线播放_麻豆在网站1区_欧美日韩在线视频首页_天天狠天天天天透在线

sales@zmscable.com

An article to read: How to solve the heating problem of the cable?

1 year ago 805 0 News

電纜著火.jpg


Cable heating problem has been industrial enterprises or civil building equipment operation process plagued the operation and maintenance personnel.

Solving the problem of long-term cable heating is bound to accelerate the cable and equipment insulation aging, and even lead to insulation breakdown fire!

How to solve the heating problem of the cable? Many people will not pay attention to this problem, and think cable heating is normal natural consumption.

ZMS cable editor as a cable industry professional, first takes you to understand what serious harm can be caused by cable heating.


The harm of cable heating

Cable heating phenomenon, If you do not find the cause of timely troubleshooting, the cable continues to run continuously energized will produce a thermal breakdown of insulation. 

Caused by the cable phase short circuit tripping phenomenon, may cause a serious fire.

The following content analyzes the causes of cable heating and puts forward reasonable measures to solve the problem.


Cable heating causes

Cables are the medium for power system power transmission.

Essentially, the cable is also an electrical load, only because the cable's own resistance is very small.

Under normal circumstances in the cable loss of electricity accounted for a small proportion of the total transmission and distribution of energy.


The following factors cause the cable to heat up abnormally:


The cable itself

The cable is not produced in accordance with national standards for standard cross-section, resulting in the cable itself resistance exceeding the standard.

The copper used for cables contains too many impurities and does not meet the purity standard of electrical copper, resulting in the cable itself resistance exceeding the standard.

The thickness of the cable insulation layer does not meet the standard or the amount of glue in the insulation material does not meet the standard, resulting in the insulation resistance of the cable between the phases does not meet the standard.

Cable selection and load current mismatch, long-term more than the normal operation of the cable current-carrying capacity.


Laying environmental factors

During construction, the terminal size is small or the terminal is not tightly crimped with the cable, resulting in the resistance at the cable end exceeding the standard.

Cable laying is too dense, resulting in the normal operation of the cable heat is not dissipated in time.

Cable laying in the slot box or closed bridge, is not conducive to heat dissipation.

Cables are laid around heat sources, e.g. near heat pipes, and are not insulated.

Ordinary cables are used for high-frequency loads, resulting in overheating of the cables.

Excessive harmonic content in the grid, which does not match the cable design, leads to overloading.


Measures to solve the problem of cable heating

For the cable's own factors lead to the heating of the solution measures

1 Strictly according to the standard parameters to provide test reports

Including cross-sectional area, copper content, insulation thickness, and insulation materials such as rubber content and other indicators.

2 Strictly control the design and selection

In accordance with national standards, the cable selection principle is: that the cable current-carrying capacity should be greater than the rated current rectification value of the circuit breaker at this level.

In the project, it is wrong to use the load calculation current as the basis for selecting the cable current-carrying capacity.

3 Strictly in accordance with the operation of the test

Before the cable installation, the insulation resistance of the cable is detected in strict accordance with the operating procedures.

For the laying of the environment leading to the heat of the solution measures

Terminals meet the requirements of the standard cross-section, crimping construction standard specifications, in line with the requirements of the construction process.

Cable laying to avoid disorganization, stacking too dense, and other irregularities.

Fixed in accordance with the specification requirements, try to avoid multi-layer stacking, which should be laid in a single layer, up to two layers.

For cables laid in the slot box or airtight bridge, properly set up ventilation holes, or take the necessary ventilation measures.

When cables are laid in close proximity to the heat source, the spacing distance required by the specification is complied with, or measures such as heat-insulating boards are taken.

High-frequency loads should use high-frequency special cables.

Harmonic management measures of the power grid are not limited to the centralized management of the substation, but also according to the site conditions appropriate increase in situ compensation.


INQUIRY
主站蜘蛛池模板: 樱桃视频高清免费观看在线 | 高清视频一区二区 | 国产精品嫩草影院ccm | 4438╳全国最大色倩网址 | 精品亚洲永久免费 | 自拍偷拍亚洲 | 成人123 | 天天澡天天添天天摸97影院 | 久久久久免费网站 | 一个人在线观看的WWW片 | 中文字幕熟女人妻av一区二区三区 | 亚洲一二三中文字幕 | 免费的色网站 | 国产自娱自愉四虎 | 99久久人妻无码精品系列蜜桃 | 无码无套少妇毛多18PXXXX | 精品国产一区二区三区性色 | 欧美美乳视频网站在线观看 | 欧美日韩一区二区三区 | www99热| 欧美精产国品一二三类产品特点 | 91精品久久久久久粉嫩 | 亚洲国产国语自产精品 | 亚洲av成人一区二区三区观看 | 天天天天天操 | 国产91视频在线 | 成人播放 | 欧洲a老妇女黄大片 | 久久精品国产久精国产爱 | 青青伊人久久 | 理论片午午伦夜理片I | 亚洲午夜精品A片一区二区三区 | 国产成人亚洲综合a∨婷婷图片 | 国产一区二区怡红院 | a天堂在线观看视频 | 久久夜精品va视频免费观看 | 999ZYZ玖玖资源站永久 | 久久国产福利国产秒拍 | 99在线精品视频免费观看软件 | 免费观看色视频 | 亚洲综合欧美动漫丝袜图 |