Do you know the general inspection items of Cable ?

2 years ago 1692 0 News

ABC-cable-1024x343.jpg

The purpose of the power cable line test is to detect defects and weak links in time, so as to deal with them in time, and to prevent the defects from expanding and damaging the cables. 

Cables are buried in the ground, because it is not easy to check, and experiments mainly judge the change in insulation performance. 

Therefore, all newly installed power cable lines and running power cable lines should be electrically tested, such as the commonly used CU/PVC ECC cable, flexible PVC cable, and CU XLPE SWA PVC armored cable.


Conductor resistance, insulation thickness, insulation thinnest point thickness, sheath thickness, sheath thinnest point thickness, insulation resistance, voltage, external dimensions, cable stranding direction at 20 °C.


Main Inspection Contents:


Mainly check the cable quality, insulation status, and various tests on the cable line. 

Since the power cable is used to transmit high-power electric energy and work under high voltage and high current conditions, its electrical performance is very high. 

In order to test the cable Performance testing is required for manufacturing and installation quality, reducing operational accidents, and improving power supply reliability.


Safety Precautions For Operational Testing:


1. Testers familiar with the technical test standards and technical regulations should be selected as the primary staff.


2. It is necessary to arrange the test site reasonably and scientifically, to ensure that the tester's range of activities and the minimum safe distance from the live part meets the requirements of the following table.


3. The high-voltage lead-out line of the test equipment should be shortened as much as possible. 

The distance between the grounding body and the unrelated equipment should be kept at a sufficient safety margin to prevent the grounding body and other objects from being discharged during the test and to prevent the induced voltage from being generated by the nearby working equipment. 


4. The tester should concentrate on and operate in an orderly manner. 

When abnormal conditions are found, the boost should be stopped first, followed by depressurization, power failure, and discharge, and measures should be taken to analyze the cause of the abnormality.


5. After the test, the tester should remove the self-installed grounding short-circuit line and conduct a comprehensive inspection of the tested cable to clean up the debris at the work site.


6. Fill in the test record in time, sort out the test report, and restore the equipment lead removed or changed in the test.


Tags:
Power Cable
INQUIRY
主站蜘蛛池模板: 全免一级毛片 | 久久久久精品无码专区 | 国产成人精品亚洲日本语言 | 欧美成人A片一区二区不卡 www.日日干 麻豆特级毛片 | 久久东京| 张雨绮被揉到高潮下不了床 | 扒开老师大腿猛进AAA片 | 亚洲成人av综合 | 无码人妻丝袜在线视频红杏 | 日本男人女人做爰视频男人 | 久久夜色精品国产噜噜亚洲SV | 嗯快点别停舒服好爽受不了了 | 无码日韩人妻AV一区 | 国产午夜精品视频免费不卡 | 中国一级片在线播放 | 欧亚精品卡一卡二卡三 | 最新精品香蕉在线 | 国产成人AV综合久久视色 | 国产高清在线精品一本大道 | 久章草影院| 在线成年人视频 | 山东中年夫妇大白天露脸自拍 | 很污网站| 99久久国产综合精品女图图等你 | 亚洲一区二区精品在线观看 | 亚洲一区二区自拍偷拍 | aⅴ久久欧美丝袜综合 | 国产乱码久久久久久 | 人妻少妇被粗大爽.9797pw | 成人国产精品齐天大性 | 97超碰精品成人国产 | 尤物久久av一区二区三区亚洲 | 久草成人在线观看 | 国产免费一级 | www.成人18啪影院.com | 亚洲国产精品高潮呻吟久久 | 69国产精品人妻无码免费 | 精品国产一区一区二区三亚瑟 | 久久亚洲色WWW成人欧美 | 欧美第一区第二区 | 99免费在线观看 |