女人张开腿让男桶喷水高潮_国内精品免费一区二区2001_日韩综合在线播放_麻豆在网站1区_欧美日韩在线视频首页_天天狠天天天天透在线

sales@zmscable.com

How to avoid the accelerated ageing of the cable insulation and damage

2 years ago 8523 0 News

Ways to avoid aging of cable insulation

微信圖片_20220728101958.jpg

In cable trench and cable tunnel should have good drainage facilities, such as setting water shallow groove, collecting well, and can effective drainage, set up automatically when necessary, to stop pumping device, prevent water, maintain internal dry. In cable trench, tunnel longitudinal slope drainage. To prevent water, corrosive gas or liquid, and combustible liquid or gas into the cable, cable tunnel. Cable tunnel should be natural ventilation, and bear cable normal load to tunnel air temperature is higher than 40 ~ 50 ℃, can adopt natural ventilation and mechanical ventilation in a way that the combination of ventilation. The fan of the ventilation system shall be the fire detector chain, to ensure that they can automatically stop when the tunnel fire wind, shall not be used as a cable tunnel ventilation system into the duct.

Should avoid the cable fire door in a normally closed state, with the cable fire barrier completely sealed, in cable trench cover plate gap filling sealing effects such as cable ventilation and heat dissipation. And to completely closed the cable and the cable also makes normal patrol impossible, not finding cable fault in time.

According to statistics, caused by the failures of the cable head cable fire and explosion accidents accounted for about 70% of the total cable accident. Must be strictly empty type cable head production materials and process quality. Request made by the service life of the cable head, cannot under the service life of the cable. On the streets of rated voltage grade and its insulation level, shall not be lower than the connecting cable of rated voltage level and its insulation level. The insulation head on both sides of the insulation between the pressure value, shall not be lower than the cable protective layer insulation level 2 times. The joint form should be adapted to set up the environment conditions, and does not affect the flow capacity of the cable. 2 ~ 3 m cable head on each side, within the scope of the fire prevention should be taken to make a fire spread processing package belt.

In general, the weak link of cable insulation cable perspective, so to strengthen the monitoring and management of cable head is an important part of the cable fire. Terminal cable heads must not be put in cable ducts, cable tunnels, cable trays, or cable interlayers in the middle of the cable head must be cataloged, and use a variety of testing equipment for testing. Cable heads have found abnormal temperature rise or odors, smoke, and emergency exit early operation, to avoid the operation of the cable into the fire.

Among various cable heads, length shall ensure that adequate safety distance between two or more cables in the same position of the head, between cable heads with other cables tight seal measures should be taken.

INQUIRY
主站蜘蛛池模板: 天天综合网亚在线 | 久久国产免费 | 国产裸体舞hdtube | 久久全国免费视频 | 国产女色| 成人亚洲一区无码久久 | 国产学生系列一区二区三区 | 日本特黄特色大片免费视频 | 国产精品久久久福利 | 国产精品无码久久AⅤ人妖 秋霞av国产精品一区 | 日韩国产高清一区二区 | 国产精品999久久久 国产AV无码国产AV毛片 | 亚洲AV综合色区手机无码一区 | av有码在线 | 天天摸天天操天天干 | 国产精品99久久久久久人 | 99精品久久久国产一区二区三 | 穿书自救指南2樱花动漫免费观看 | 99视频一区二区三区 | 久久久久影院色老大2020 | 四虎最新在线观看地址 | 韩国三级中文字幕HD久久精品 | 爱情岛论坛网址永久首页 | 一级毛片性色一区二区视频在线 | 大黄无码网站在线观看 | 国产激情久久久久老熟女亚洲 | 黄色网免费在线观看 | 国产一区三区在线 | 国产午夜福利内射青草 | 欧美日韩中字 | 超碰av网站| 日本一级大毛片a一 | 91福利视频在线观看 | 把护士强奷到舒服的动态图 | 色拍拍噜噜噜3av在线 | 久碰香蕉线视频在线观看视频 | 久草网免费 | 成人黄色av片 | av片在线观看永久免费 | 曰本无码人妻丰满熟妇5g影院 | 国产精品久久久久久久综合 |