The Causes and Treatment of Cable Filling with Water


Water Causes

1 Storage

The newly purchased tube-to-tube cable is sealed on both ends with a plastic gland.

But after a while, the remaining cable is not sealed and water vapor penetrates the cable.


2 Cable Laying

When laying a cable, the cable head wrapped in plastic paper is sometimes submerged in water to allow water to enter the cable. 

Occasionally the outer sheath breaks when towing and tubing.

3 After Laying

Not in a timely manner cable production, so that a large number of water vapor into the cable.

4 Cable Head Production

In the cable head production, due to the preparation of the staff of the effect, the cable ends sometimes slip into the cable wells with water.

5 Cable Running

During the operation, the occurrence of intermediate joint breakdown and other failures, cable wells will be along the gap in the water into the cable.

In the construction site, the external force caused by cable damage or breakdown, cable water will occur.

欒1.png

Treatment Method

Drying is very difficult once the water fill into the cable (such as pressurized nitrogen blowing heat), generally do not configure the appropriate equipment. 

In practice, if the cable such as water, just saw the front a few meters, such as the entire cable has been into the water, it is not desirable. 

Therefore, the prevention of water inflow cable, prevention should be based, using the following measures:

1. Cable head should be sealed. The cable ends that have been cut off must be sealed with plastic (using cable-specific glands) to prevent moisture ingress.

2. Cable laying in time for the production of cable head.

3. Strengthen the cable head production process management.

4. Using shrink cable head.

5. 10kV system with 8.7/10kV level of cable. At the same time to thicken the cable insulation.

6. Using PVC plastic double wall corrugated pipe. 

The tube corrosion-resistant, smooth inner wall, good strength and toughness, so laying in the cable buried, can greatly reduce the damage to the outer sheath of the cable.

7. Cable trench (pipe) and cable well design. 

Due to the restriction of the conditions, the cables are laid directly or in the form of cable ditches and are buried in direct burdens.

If they belong to coastal rainy areas, there is water in the cable ditches or cable wells for many years. 

Due to the depth of the cable duct or cable well exceeding the depth of the sewer, drainage is difficult, so coordination should be made during planning to facilitate drainage of the cable duct (well). 

If you can not do cable wells do not accumulate water, then the middle of the cable hole in the bracket propped up. 

In addition, the design of the cable management, as straight as possible to reduce the elbow, the cable easy to lay.

The same time, in the production of cable wells, into a large cable and small cable wells, cable wells can be used to pull the cable.

Doing intermediate joints, and in the middle of the road is not easy to do wire wells, but it must be a corner of the place, changed to a small cable well, the cable well is only used in laying cables divert pulley.


Tags:
PVC
INQUIRY
主站蜘蛛池模板: 国产二区精品视频 | 人人揉人人捏人人爽五月天 | 波多资源在线中文字幕 | 国产微拍精品 | 日韩五码在线观看 | 亚洲中文字幕无码日韩精品 | 性做久久久久久久久 | 少妇大叫太大太爽受不了在线观看 | 希岛爱理av一区二区三区 | 理论片午午伦夜理片影院99 | 欧产日产国产蜜网站 | 欧日韩毛片 | 久草999 | 国产一级义婬片AAA毛片久久 | 久久久亚洲欧洲日产国码是AV | 日韩成av人片在线观看 | 91麻豆精品国产片在线观看 | 欧美精品欧美激情 | 网曝门国产一区二区三区四区 | 亚洲成人经典 | 亚洲人成人一区二区三区 | 亚洲乱码一卡二卡四卡乱码新区 | 曰韩黄色片| 国产一区二区三区四区三区四 | 澳门四虎 | 免费观看黄色网页 | 狠狠色狠狠色综合日日32 | 2021av在线无码最新 | 国产精品久久久久久成人 | 在线观看黄色免费 | 国产精品九九九九九 | 新版天堂8中文在线最新版官网 | 一级毛片在线免费观看视频 | 亚洲无人区码一码二码三码四码 | 亚洲AV无码AV制服丝袜在线 | 在线aⅴ亚洲中文字幕 | 国模两腿玉门打开图无码 | 亚洲色成人一区二区三区小说 | 亚洲精品影视在线观看 | 久久精精品 | 操操操日日日干干干 |