What are the problems in power cable construction?

2 years ago 2107 0 News

1539827208928801.jpg


Description of Problems in the Construction of Power Cables


1 Eddy Current Problem caused by High Current Power Cable


In the construction of power cables, steel brackets are used, steel protection tubes are used, and cable cards and overhead laying are used. 

Any steel (iron) closed loop formed around the power cables may form eddy currents. 

Especially in high current power cable systems, eddy currents are larger.

In a certain place, there was a 10kV overhead cable of about 0.4km, which used steel stranded wire as an overhead support. 

The postal and telecommunications cables were used to fix the cable. 

The grounding fault occurred shortly after commissioning. 

After checking, the cable clamp and the steel strand formed a closed eddy current. 

The circuit burns the insulation of the cable after heating, causing a ground fault. 

After analysis and test, after the insulation between the cable clamp and the steel strand is insulated by the insulating layer (such as the stripped cable insulation sheath), there is no eddy current phenomenon, and the operation is normal for many years, and no similar failure occurs. 

It can be seen that during the construction of the power cable, measures must be taken to prevent the formation of a steel (iron) closed loop around the cable to prevent the eddy current from occurring.


2 Mechanical Damage caused by Turning of Power Cable


Due to the large outer diameter of the power cable, transportation and laying are difficult, and the power cable has strict requirements on the turning radius. During the construction of the power cable, if the turning angle is too large, the inside of the conductor may be mechanically damaged, and the mechanical damage may not be seen due to being covered by the cable insulation. 

Even if the loop resistance is measured, it is difficult to find the defect by the insulation and leakage test. 

When it is overheated at the damaged location, the insulation strength of the cable is reduced until a fault occurs. 

The author has found that the cause of multiple cable head failures is that the length of the three cable heads is the same when the cable head is made. 

Due to the terrain limitation when the device is connected, the middle phase cable head is elongated and becomes arched, and the root of the cable head is damaged and discharged. 

After taking measures, according to the connection of different equipment, the length of the connection of the middle phase cable head is appropriately shortened, so that the three-phase cable head is free from external force, and the operation effect is proved to be good. 

It can be seen that during the cable construction process, the torque received by the cable should be reduced as much as possible. 

When the cable turns and the cable is left, the cable is naturally bent to prevent internal mechanical damage.


3 Power Cable Moisture-Proof Problem


The operating experience shows that most of the medium and low voltage power cable faults are cable intermediate joints and terminal head faults, while the middle joints and terminal head faults are mostly due to poor sealing, moisture intrusion and insulation degradation, and medium and low voltage power cables. 

The network adopts the dendritic power supply mode, and the number of cable terminals is large. 

Therefore, sealing the cable terminal and the intermediate joint is one of the important measures to ensure the safe and reliable operation of the cable.


4 Medium and Low Voltage Power Cable Grounding Problem


In the common medium and low voltage power cable network, since the three-phase load is not equal.

If a cable with a metal sheath is used, the grounding problem of the metal sheath must be considered, and the grounding at any point of the metal sheath must be ensured. 

The normal induced voltage must not be greater than 100V. 

The author believes that in the medium and low voltage cable network, all the cable joints should be provided with a grounding pole (net) and the metal sheath is reliably grounded.


INQUIRY
主站蜘蛛池模板: 日韩精品亚洲专区在线观看 | 亚洲视频久久 | 欧洲丰满少妇做爰视频爽爽 | 丝袜老师张开腿任我玩弄 | 欧美日韩在线高清 | 久久久精品成人免费视频 | 国产一区二区三区视频在线 | 久久久无码精品亚洲日韩蜜桃 | 狠狠操在线 | 欧美日韩亚洲91麻豆精品 | 国产妇女馒头高清泬20P多毛 | 操女生免费视频 | 少妇大叫太大太爽受不了在线观看 | 亚洲AV无码乱码国产一区二区 | 国产精品免费播放 | 又黄又爽又色的视频 | 国产成人啪精品午夜网站 | 欧美成人猛片AAAAAAA | 日日射av | 少妇极品熟妇人妻无码 | 日韩搞逼 | 国内精品久久久久久久影视麻生 | 黑人chinese中国china国产 | 日本三级影片 | 福利视频区| 综合自拍 | 亚洲日韩成人无码私人影院 | 久久精品国产亚洲AV大全 | 午夜影院伦理片 | 男吃奶玩乳尖高潮视频 | 亚洲国产中文字幕新在线vr | 成熟女人毛片www免费版在线 | 精品性视频 | 国产精欧美一区二区三区久久 | 亚洲AV女人的天堂在线观看 | 国产成人亚洲欧美久久影院 | 日本不卡1 | 久久久亚洲欧洲日产国码是AV | 第九色综合 | 91久久奴性调教 | 精品中文字幕一区 |