What are the treatment methods for XLPE power cables with moisture?

2 years ago 1504 0 News


  1540432581164829.jpg


XLPE Power Cable Moisture Treatment Method



In urban power grid reconstruction projects, cables, especially polyethylene insulated power cables, have been widely used. 

However, due to the particularity of the cable, there are special requirements for the installation, operation and maintenance of the cable. 

Cable dampness or water ingress reduces the insulation resistance of the cable, which is an important aspect of the cable line running accident.


Causes and Hazards of Cable Flooding


(1) When the new whole cable is shipped from the factory, both ends are sealed with plastic sealing sleeves. 

However, after the construction site is used according to the actual situation, the remaining part is simply wrapped with plastic cloth to break the gap. 

It is placed in the open air and the seal is not good. For a long time, it will inevitably have water vapor infiltrated into the cable.


(2) When laying cables, it is necessary to frequently cross roads, bridges and culverts. 

Due to weather or other reasons, a lot of water is often accumulated in the cable trenches. 

In the process of laying, it is inevitable that the cable heads will be immersed in water. 

Because the plastic cloth is not tightly wrapped or broken, the water enters the cable.

In addition, when the traction and the pipe are worn, the outer sheath or even the steel shovel is sometimes scratched. 

This phenomenon is particularly prominent when using mechanical traction.


(3) After the cable laying is completed, the cable head is not produced in time due to the limitation of on-site construction conditions。

So that the unsealed cable breakage is exposed to the air for a long time, even immersed in water, so that the water vapor enters the cable in large quantities.


(4) During the cable head making process (including the terminal head and the intermediate joint), the newly processed cable ends may accidentally fall into the accumulated water in the site due to the negligence of the construction personnel.


(5) In the normal operation of the cable, if a failure such as breakdown occurs for some reason, the water in the cable trench will enter the cable inside the fault point.

In civil construction, especially when using large construction machinery.

It is not uncommon for a construction site to have cable breakage or breakdown due to various human factors. 

In the event of such an accident, cable insulation is severely damaged and the cable is also flooded.


After the cable enters the water, under the action of the electric field, aging will occur, and finally the cable will break down.


INQUIRY
主站蜘蛛池模板: 亚洲va欧美va国产综合久久 | 黄色成人一级片 | 在线国产福利 | аⅴ中文天堂最新版在线 | 一女被二男吃奶a片免费观看 | 飘雪影院手机免费观看免费动漫 | 亚洲成熟人网站 | 天天躁日日躁狠狠的躁天龙影院 | 久久亚洲精中文字幕西条琉璃 | 国产玉足榨精视频在线 | 欧美成人精品三级一二三在线观看 | 男女黄色一级视频 | 97色国产 | 成人午夜激情福利最新在线播放 | 国产草比视频 | www.999精品| 国产综合久久99久久 | 521色香蕉网站在线观看 | 成全视频在线观看免费高清在线观看 | 色视频在线观看网站 | www.xxx视频| JK小仙女自慰流白浆呻吟 | 美女不带套日出白浆免费视频 | 日韩久久久久久久久 | 中文字幕日韩一区二区 | 亚洲精品久久久久一区二区三区 | 精品产国自在拍 | 久久嫩草精品久久久久 | 日产乱码一二三区别免费麻豆 | 99香蕉国产精品偷在线观看 | 中文字幕人妻无码一夲道 | 色999久久久精品人人澡69 | 精品久久久久久久久久久久久久久久久久久 | 老人把我添到了高潮A片 | 一级毛片一级黄片 | 啪啪玩小处雏女毛免费 | 麻豆九九九 | 91麻豆精品国产91久久久点播时间 | 欧洲中文字幕 | 日韩人妻无码一区二区三区久久 | 久久久九九 |