女人张开腿让男桶喷水高潮_国内精品免费一区二区2001_日韩综合在线播放_麻豆在网站1区_欧美日韩在线视频首页_天天狠天天天天透在线

sales@zmscable.com

What issues should be noted during the construction of power cables?

2 years ago 1570 0 News

1553740595585559.jpg


Problems to be Noted During the Construction of Power Cables


Cable Laying Method


The laying methods of the cable include direct burial laying, pipe laying, shallow groove laying, cable trench laying, cable tunnel laying, and overhead laying. 

In terms of skill comparison, cable tunneling methods and cable trenching methods are the best methods of laying, as these two methods facilitate cable construction, maintenance, and repair. 

In some developed cities, when planning and building cities, they have thought about sharing tunnels. 

The practice has proved that the shared tunnel operation is outstanding, which greatly reduces the number of repeated investments and the repeated excavation of the road surface, but the initial investment is endless.


Cable Selection


Commonly used power cables include oil-immersed cables, PVC-insulated cables, and cross-linked polyethylene cables. 

They are extended to different types of special cables depending on the application. 

Now, with the continuous improvement of production skills and production processes, XLPE cables have become the most widely used cable products. 

When selecting cables, they should be selected according to the different environments and conditions used. When using the direct burial and shallow trough laying methods, consider the use of steel cables.


Selection of Cable Cross-Sectional Area


The selection of the cable cross-sectional area is related to the amount of capital contribution, the loss of the line and the voltage quality, and the service life of the cable. 

Therefore, based on the results of the load guessing, use the developed vision to select the appropriate cross-sectional area.

So that the power cable is satisfied with the core temperature request and voltage drop request under the maximum operating current, and the thermal stability request under the maximum short-circuit current. 

Because the load guessing operation is difficult and the accuracy is low, when selecting the cable cross-sectional area, it is also satisfied with the request of the “Urban Medium and Low Voltage Distribution Network Transformation Skills Guide” and the “Urban Power Network Planning Guidelines”.


For Cable Network and Cable Network Automation


Following the continuous implementation and application of power cables in the distribution network, the distribution network can be divided into cable networks and overhead networks (including overhead and cable hybrid networks). 

"The implementation status and compensation for the "Urban Medium and Low Voltage Distribution Network Transformation Skills Guide" also made specific requests for cable distribution network automation. 

Therefore, when selecting the cable network in the regional network distribution network, new skills, and new equipment should be selected according to the request of distribution automation. 

If there are conditions, it is necessary to think about the automation pilot operation. 

When the conditions are not mature, the supporting equipment should be selected. 

Thinking is well taken to lay the groundwork for completing the automation plan.


INQUIRY
主站蜘蛛池模板: 91老司机福利在线 | 国产精品高清视亚洲精品 | 在线一级片| 亚洲日韩看片无码超清 | 国产尤物在线观看yw | 邻居少妇张开腿让我爽了一夜 | 天天草综合 | 影音先锋中文字幕亚洲资源站 | 嫩草影院网站在线 | 爱情岛论坛网址永久首页 | 无码伊人久久大杳蕉中文无码 | 中文字幕_第3页_高清免费在线 | 亚州一区 | 欧美精产国品一二三类产品特点 | 国产一区二区网站 | 亚洲精品88p | 欧美13一14娇小xxxx | 欧美精品精品一区 | 日韩国产精品无码一区二区三区 | 国产精品爽爽爽 | 久久综合亚洲 | 久久久久久免费视频 | 国产精品3| 久久久精品理论A级A片 | 777黄色| 手机看片日韩精品 | 久久这里只有精品视频9 | 久久青青无码AV亚洲黑人 | 91精品国产爱久久丝袜脚 | 少妇大叫太大太爽受不了在线观看 | 国产视频福利 | 免费观看成人欧美WWW色 | 91精品91久久久中77777老牛 | 国产精品久久久久久在线 | 成人aa片免费观看视频 | mimiai最新网站入口 | 竹内纱里奈激烈高潮 | 苍井苍空A免费井线在线观看 | 国产午夜免费视频 | 国产视频二区 | 国产大学生一级毛片绿象 |