1. Why should a return line installed along the cable be installed in the grounding mode of the single-core cable sheath at one end?

Answer: In the cable line grounded at one end of the metal sheath, in order to ensure that the induced voltage in the sheath does not exceed the allowable standard, a conductor laid along the cable line in parallel must be installed, and both ends of the conductor are grounded. Streamlined. When a single-phase ground fault occurs, the ground short-circuit current can flow back to the system center point through the return line, and the magnetic flux generated by the ground current through the return line cancels the magnetic flux generated by the ground current of a part of the cable lead, thereby reducing The induced voltage of the sheath in the event of a short circuit fault.


2. Can a cable project be divided into several projects?

answer:

(1) Construction site transportation: including loading and unloading, transportation and empty return of engineering materials from warehouse to construction site.

(2) Local engineering: including road excavation, tunneling, and channel construction.


(3) Laying work: including laying, intermediate head making, shovel cover, buried pipe, school tide, production of traction head, etc.

(4) Both ends of the project: including the production and installation of the branch, the suspension bridge and its foundation, the production of the terminal head, the installation of the oil pressure and signal device, and the electrical performance test of the name.

(5) Stopping works: including the production of oil-filled cable plugs, the installation of fuel tanks, automatic drainage and signal devices.

(6) Grounding engineering: including insulation joints, transposition boxes, protectors, grounding box installation, etc.


3. What inspections should be carried out on the acceptance of cable lines?

Answer: (1) The cable specifications should meet the requirements, the arrangement should be neat, no damage, the signs are complete, correct and clear;

(2) The fixed bending radius of the cable, the relevant distance and the wiring of the metal sheath of the single-core power cable shall meet the requirements;

(3) The cable terminal and the middle head are not leaking oil, and the installation is firm. The oil pressure of the oil-filled cable and the setting value of the meter should meet the requirements;


(4) Good grounding;

(5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted;

(6) There should be no debris in the cable trench, tunnel and bridge, and the cover is complete.


INQUIRY
主站蜘蛛池模板: 巜被社长侵犯的人2中文在线 | 熟妇的奶头又大又长奶水视频 | 国产精品禁久久精品 | 成人亚洲一区无码久久 | 免费一区二区三区视频导航 | 国产高清在线精品一本大道 | 成年女人免费又黄又爽视频 | 热九九精品| 国产中文字幕亚洲 | 无码国产精品久久一区免费 | 精品久久久久久无码AV | 国产一区二区看久久 | 在线免费观看视频一区二区 | 欧美激情自拍偷拍 | 福利精品在线观看 | 亚洲三级性片 | 亚洲Av秘?无码一区二区 | 国产成人久久精品77777的功能 | 亚洲日本乱码一区两区在线观看 | 国产一区二区高清 | 日本夜爽爽一区二区三区 | 日本不卡免费播放 | 人妻少妇偷人精品无码 | 国语对白做爰xxxⅹ性69视频 | 亚洲av图片 | 囯产av无码片毛片一级 | 亚洲成人免费视频 | 久久综合九色 | 国产激情免费 | 好看的黄色录像 | 欧美综合社区 | 免费一区二区三区四区 | 少妇性色午夜淫片aaa播放5 | 国产玖玖在线视频 | 亚洲欧美日本国产综合 | 久久久亚洲一区二区三区 | 欧美国产视频一区二区 | 少妇大叫太大太爽受不了在线观看 | 日本高清wwwff174 | 国产成本人片无码免费 | 久久青青草原国产毛片 |