How to Install Integral Prefabricated Cable Joints?

3 years ago 1758 0 News

Integral prefabricated joints are by far the most common type of cross-linked cable joints. The factor that has the greatest impact on the quality of the joint during field installation is the site-specific installation tools. The quality of prefabricated parts should be completed in the factory with electrical tests and reliable quality. According to the characteristics of different prefabricated parts, special field installation tools are used, including field reaming and traction. Figure 6-22 shows a schematic diagram of a typical monolithic prefabricated part. The following focuses on the construction points of such cable joints.

 

1. General Requirements

(1) Before the joint, the quality, quantity, and specifications of the installation materials should be checked.

(2) Cable insulation and preforms should be cleaned and completely dry before the final positioning of the insulated preforms.

(3) After the cable insulation is polished, it should be carefully inspected to ensure that the surface of the insulation is free of damage.

(4) Cable joint materials shall be stored in a dust-free, low humidity (%) indoor environment with a temperature not exceeding 40 °C. Long-term exposure to sunlight is strictly prohibited.

(5) All joint materials should be used within their expiration date.

 

2. Grinding Treatment of Insulation and Insulation Shield

(1) Wrap two layers of PVC tape around the insulation layer at the junction of cable insulation and insulation shield as protection to prevent grinding of the insulation layer.

(2) Sand the insulation surface at the boundary of the cable insulation and insulation shield with 120 meshes, 240 meshes, and 320 mesh sandpaper (applicable to 110kV voltage level).

(3) Check the diameter of the cable insulation at 6 places with vernier calipers.

(4) Caution. Each place should be measured twice in horizontal and vertical directions to ensure that the actual size of the cable insulation layer meets the process requirements. ② To ensure that the cable insulation layer is round, the difference between the measurement results in two directions should be less than 0.5 mm. ③ The outer diameter of the polished insulation layer should be controlled within the allowed value.

(5) When the inspection results meet the requirements, polish the cable insulation layer with 400 mesh sandpaper. Finally, tear off the PVC tape on the insulation shield layer and continue polishing from the insulation layer to the insulation shield layer.


INQUIRY
主站蜘蛛池模板: 99香蕉国产精品偷在线观看 | 日韩久久一区 | 黑人巨茎美女高潮视频 | 国产999精品久久久久久 | 四虎国产精品永久在线观看 | 91成品入口| 国产精品视频成人 | 欧美一页| 国产网站91 | 国产精品久久国产三级国电话系列 | 欧美日韩综合精品 | 熟妇人妻无码中文字幕老熟妇 | 欧美六区 | 国产69精品久久久久99 | 久视频在线 | 极品久久久久久 | 黄页免费看 | 91一区二区 | 在线观看午夜看亚太视频 | 欧美日韩国产成人在线91 | 制服丝袜第10页综合 | 国产边打电话边被躁视频 | 国产午夜三级一区二区三桃花影视 | 久久精品国产亚洲blacked | 自拍日韩亚洲一区在线 | 欧美一区内射最近更新 | 国产成人1区 | 狠狠躁夜夜躁人人爽超碰女h | 亚洲一区二区三区在线网站 | 日本天天躁狠狠躁噜噜噜 | com.黄| 久久SE精品一区精品二区国产 | 天天爽夜夜操 | 久久久久久久久国产 | 九九久久久久 | 免费精品自在久久 | 亚洲vs日韩vs欧美vs久久 | 久久国产青偷人人妻潘金莲 | 国产片XXXXA片国语对白 | 91色噜噜噜 | 一级片黄色免费 |