How to Install Integral Prefabricated Cable Joints? - 2

3 years ago 1257 0 News

In this article, we continue to introduce how to install the cable joints

3. Insulation shielding treatment:

To ensure the contact between the insulation shielding layer and the shielding layer inside the preform, the insulation shielding layer shall be extended. The common methods are coating semi-conductive paint and molding semi-conductive tape.

1) Apply semi-conductive paint: clean the cable insulation with ethanol or another suitable solvent, dry it with a hot-air gun, and protect the insulation with plastic film. Apply two coats of semi-conductive paint on the extended part of the insulation shield. The painting shall be smooth and flat. Dry the semi-conductive paint with a high-power hot-air gun for at least 20min. Protect the treated cable with plastic film.

2) Molded semi-conductive tape: wrap the non-vulcanized semi-conductive tape around the extension of insulating semi-conductive shield, and heat vulcanization with heating tape.

4. Insert insulation perform:

1) Both ends of the cable shall be sleeved with all connecting accessories, respectively. Such as heat shrinkable pipe, copper-sleeve connector.

2) There are two methods for inserting insulating preforms: on-site diameter expansion method and traction method:

Diameter expansion on site: the insulating preforms shall be expanded in a clean and dust-free environment, and the holding time after diameter expansion of the preforms shall not exceed 4H. It is recommended to complete the installation within 2H.

Special tools shall be used for diameter expansion, as shown in Figures 6-6. The inner and outer surfaces of the expanding pipe shall be smooth without sharp corners or damage. The inner and outer surfaces of the expanding pipe and prefabricated parts shall be cleaned and dried with an electric hair dryer before expanding.

Pour silicone oil into one end of the preform and rotate it to ensure that the mandrel is coated with silicone oil. Then, the preform shall be expanded with a special diameter expansion tool, and the expanded preform shall be wrapped with clear plastic film.

Traction: install traction tools on the prefabricated parts, as shown in Figure 6-5. Pull the traction plate by the traction wrenches on both sides to sleeve the preform into the cable.

5. Install Shield:

1) Dig out two grooves on the cable insulation on both sides with special tools.

2) Connect the copper braided tape in the connecting pipe with the braided copper tape in the shield.

3) Install the aluminum shield, and its surface shall not protrude from the insulating surface. Do not rotate the shield at will to prevent the braided copper strip from breaking.

4) Precautions: ensure that the outer diameter of the shield is within the allowable range of the performance.


INQUIRY
主站蜘蛛池模板: 韩国一级片免费看 | 999国产视频| 一本—道久久a久久精品蜜桃 | 黄色日本在线观看 | 俺去啦最新网址 | 亚洲国产精品成人综合色 | 手机看片日韩在线 | 啪啪喷水视频 | 无码人妻精品一区二区三区夜夜嗨 | 久久久久久久久99 | 日本一级淫片免费看 | 91无毛| 射色av | 久久久精品2020免费观看 | 亚洲成av人片 | 永久免费人禽AV在线观看 | 中国按摩xxxx做受a | 玩偶姐姐在线观看 | 天天操天天干天天曰 | 奇米国产在线 | 国产乱国产乱 | 日本大片免a费观看视频+播放器 | 色网站在线观看 | 国产一级录像 | 浮生影院大全免费观看 | 成人免费无码成人影院日韩 | 日韩乱码在线观看 | 伊人国产精品 | 久久综合综合久久 | 国产亚洲精品久久久久久郑州 | 狠狠躁夜夜躁人人爽超碰97香蕉 | 成年人天堂 | 国产成人精品福利视频 | 岛国在线视频网站 | 亚洲乱码国产乱码精品精的特点 | 亚洲日韩制服丝袜中文字幕 | 美女内射毛片在线看 | 边摸边吃奶边做爽gif动态视频 | 第一会所亚洲精品无码Av | 91精品91久久久中77777老牛 | a级片在线观看 |